Meta Pixel
Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

News and Announcements

Altech Commences Soil Survey at Johor HPA Site

  • Published November 08, 2016 5:24PM UTC
  • Publisher Wholesale Investor
  • Categories Company Updates

8th November 2016, ASX Announcement

Highlights

  • Altech commences soil drilling and survey at Johor HPA site
  • Requirement as part of detailed civil design and engineering
  • M+W Group (Singapore) co-ordinating work

Altech Chemicals Limited (Altech/the Company) (ASX: ATC) is pleased to advise that it has commenced soil survey drilling at the site of its proposed high purity alumina (HPA) plant in the Tanjung Langsat Industrial Complex, Johor, Malaysia.

Site topography, soil stability and soil analysis are required to finalise the HPA plant civil design and engineering. The Singapore office of M+W Group, Altech’s engineering, procurement and construction (EPC) contactor, is coordinating the drilling, soil studies, civil design and engineering work. The work will include a full analysis of the soil profile of the site and a determination of the piling and civil requirements.

To view the full announcement, please click on the button below.

Join over 45,000+ sophisticated investors

Join Now